窗口喷涂装置FINITURE
Fensterlackieranlage
窗口喷涂装置
FINITURE
Fensterlackieranlage
固定价格 不包含增值稅
€900
製造年份
2008
狀況
二手
位置
Pöllau bei Hartberg 

顯示圖片
显示地图
价格和位置
固定价格 不包含增值稅
€900
- 位置:
- Pöllau bei Hartberg, 奥地利

撥打
技术细节
- 工件重量(最大):
- 120 千克
- 作业高度:
- 2,850 毫米
- 功率:
- 35 千瓦 (47.59 马力)
- 空氣需求:
- 24,000 立方米/小时
- 压缩空气连接:
- 6 横杆
优惠详情
- 產品ID:
- A20820642
- 參考編號:
- 268/7
- 最後更新:
- 於 23.12.2025
描述
The existing window coating line was in full operation until December 19, 2025. The system is currently still connected to the electrical supply network but will be replaced by a new robotic coating system over the turn of the year.
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Fpedox Npzcjpfx Acyjb
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
廣告是自動翻譯的,翻譯中可能會出現一些錯誤。
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Fpedox Npzcjpfx Acyjb
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
廣告是自動翻譯的,翻譯中可能會出現一些錯誤。
这些广告您可能也感兴趣。
小广告
Pardubice
9,033 km
技术莫比代利
esa gvKVARA DIG.LIGHT 4A MECH.
esa gvKVARA DIG.LIGHT 4A MECH.
小广告
Oberkochen
9,459 km
四面刨
WEINIGProfimat 23 Fenster
WEINIGProfimat 23 Fenster
小广告
Herning
9,107 km
窗口
SCM GROUPWINDOR 60
SCM GROUPWINDOR 60
小广告
Rosmalen
9,566 km
窗户生产线
WEINIGConturex Greenline Plus
WEINIGConturex Greenline Plus
小广告
Juszczyn
8,792 km
角窗加工中心
SCMMultiflex
SCMMultiflex
小广告
Kežmarok
8,770 km
数控开窗施工榫+折边机一套
WeinigUnitec 10 + Univar 10
WeinigUnitec 10 + Univar 10
小广告
Böblingen
9,535 km
台钻
MAXIONECOMAX 14
MAXIONECOMAX 14
小广告
Racibórz
8,872 km
WEINIG 和 KOCH 窗户生产线
WEINIG i KOCH
WEINIG i KOCH
小广告
Sesto Calende
9,731 km
门窗加工中心
ScmIntegra System
ScmIntegra System
小广告
Telfs
9,479 km
底部铰链和窗口手柄镗削
GannomatTwin
GannomatTwin
您的广告已成功删除
发生错误
































































































