作业平台半挂车FAYMONVILLE
MAX Trailer MAX200 Sattelanhänger Megatrailer
作业平台半挂车
FAYMONVILLE
MAX Trailer MAX200 Sattelanhänger Megatrailer
状况
全新
位置
Essen 

显示图片
显示地图
机器数据
价格和位置
- 卖方所在地:
- Heegstraße 6-8, 45356 Essen, 德国

拨打
技术细节
- 最大载重重量:
- 36,245 千克
- 总重量:
- 45,000 千克
- 车轴配置:
- 3 轴
- 装载空间长度:
- 13,500 毫米
- 总宽度:
- 2,540 毫米
- 设备:
- 防抱死制动系统 (ABS)
优惠详情
- 广告编号:
- A21539968
- 参考编号:
- 36796
- 更新:
- 最近更新时间为 20.03.2026
描述
You can find our complete inventory of immediately and short-term available vehicles on our website.
Excerpt from the equipment list. Full equipment details available upon request.
Load area:
* Load platform made of hardwood flooring with rear chamfer approx. 1,000 mm x 8°
* 2 pairs of lashing rings (LC 5,000 daN)
* 1 pair of lashing rings (LC 10,000 daN)
* 6 pairs of outward-folding lashing rings (LC 5,000 daN)
* 2 pairs of outward-folding lashing rings (LC 10,000 daN)
* Recesses in the outer frame of the load area for attaching tension straps (LC 2,000 daN)
Landing legs:
* JOST mechanical landing legs with 2-speed gearbox for approx. 24 t lifting capacity (approx. 50 t test load)
Axles:
* BPW axles, air suspension, disc brakes (approx. 377 mm), lifting/lowering function (ET 120)
* Axle tools
Tires:
* Tires 435/50 R 19.5 – make at our discretion
* TPMS tire pressure monitoring system according to ECE R 141. Data transfer to the tractor unit is via the standardized EBS interface according to ISO 11992. The tractor unit must be capable of receiving and displaying this data for correct operation
Braking system:
* Wabco braking system compliant with EU regulations with EBS-E (2S2M) without connecting lines to the tractor unit
Steel construction:
* Steel construction made from high-strength fine-grained steels, steel grades: S355J2+N/S355MC (yield strength 355 MPa), S690QL/S700MC (yield strength 690 MPa)
Electrical system:
Ijdjyvnfaepfx Abdstd
* Electrical system in accordance with EU regulations, lighting 24 volt ASPÖCK-NORDIK (ASS3)
* All LED side marker lamps flash with the indicators
* ASPÖCK-UNIBOX at the front connection strip with sockets 24N, 24S & 15-pin. Connections as per ISO. 24N ISO-1185, 24S ISO-3731, 15-pin ISO-12098
Painting:
* Complete steel structure shot-blasted after welding with automated shot blast system, secondary blasting with corundum for optimal coating adhesion
* HRM metalizing of the entire chassis with ZINACOR 850 (85% zinc / 15% aluminum) for optimum corrosion protection
* Final coating with two layers of 2K topcoat, solid in RAL 3002 Carmine Red in accordance with the RAL System 841GL
* Rear section metalized and painted RAL 9010 (Pure White)
* Paint finish tested to ISO 9227-NSS salt spray standard
* Cavity sealing with special wax
Including the following additional equipment:
* Yellow-red air couplings on the galvanized front connection strip
* 4 wheel chocks with holders
* 2-inch kingpin
* Load platform with heavy-duty hardwood floor
* 1 spare wheel holder under the platform on the right-hand side in the direction of travel
* Galvanized folding supports under the chamfer of the load area
* 9 pairs of stake pockets for plug-in stakes, approx. 100 x 50 mm, in the outer frame of the loading platform
* One galvanized steel front wall (EN12642-XL), approx. 1,600 mm high
* Anti-slip sand coating painted onto the central beam
* 1 INOX crosswise tool box under the deck, approx. 1,000 x 400 x 2,500 mm
* 6 pairs of WADER container sockets in the platform, for 1x 20' container, 2x 20' containers or 1x 40' container
* 3 pairs of transverse stake pocket rails mounted in the load area, for plug-in stakes approx. 100 x 50 mm
* Storage for up to 9 pairs of plug-in stakes approx. 100 x 50 mm, bolted inside the front wall
* 2 INOX toolboxes under the platform, left and right, approx. 600 x 350 x 600 mm
* Holder for aluminum ramps, crosswise under the platform, behind the axles
* 1 beacon supplied loose
* 2 pairs of ferry rings under t
该广告为自动翻译,可能存在翻译错误。
Excerpt from the equipment list. Full equipment details available upon request.
Load area:
* Load platform made of hardwood flooring with rear chamfer approx. 1,000 mm x 8°
* 2 pairs of lashing rings (LC 5,000 daN)
* 1 pair of lashing rings (LC 10,000 daN)
* 6 pairs of outward-folding lashing rings (LC 5,000 daN)
* 2 pairs of outward-folding lashing rings (LC 10,000 daN)
* Recesses in the outer frame of the load area for attaching tension straps (LC 2,000 daN)
Landing legs:
* JOST mechanical landing legs with 2-speed gearbox for approx. 24 t lifting capacity (approx. 50 t test load)
Axles:
* BPW axles, air suspension, disc brakes (approx. 377 mm), lifting/lowering function (ET 120)
* Axle tools
Tires:
* Tires 435/50 R 19.5 – make at our discretion
* TPMS tire pressure monitoring system according to ECE R 141. Data transfer to the tractor unit is via the standardized EBS interface according to ISO 11992. The tractor unit must be capable of receiving and displaying this data for correct operation
Braking system:
* Wabco braking system compliant with EU regulations with EBS-E (2S2M) without connecting lines to the tractor unit
Steel construction:
* Steel construction made from high-strength fine-grained steels, steel grades: S355J2+N/S355MC (yield strength 355 MPa), S690QL/S700MC (yield strength 690 MPa)
Electrical system:
Ijdjyvnfaepfx Abdstd
* Electrical system in accordance with EU regulations, lighting 24 volt ASPÖCK-NORDIK (ASS3)
* All LED side marker lamps flash with the indicators
* ASPÖCK-UNIBOX at the front connection strip with sockets 24N, 24S & 15-pin. Connections as per ISO. 24N ISO-1185, 24S ISO-3731, 15-pin ISO-12098
Painting:
* Complete steel structure shot-blasted after welding with automated shot blast system, secondary blasting with corundum for optimal coating adhesion
* HRM metalizing of the entire chassis with ZINACOR 850 (85% zinc / 15% aluminum) for optimum corrosion protection
* Final coating with two layers of 2K topcoat, solid in RAL 3002 Carmine Red in accordance with the RAL System 841GL
* Rear section metalized and painted RAL 9010 (Pure White)
* Paint finish tested to ISO 9227-NSS salt spray standard
* Cavity sealing with special wax
Including the following additional equipment:
* Yellow-red air couplings on the galvanized front connection strip
* 4 wheel chocks with holders
* 2-inch kingpin
* Load platform with heavy-duty hardwood floor
* 1 spare wheel holder under the platform on the right-hand side in the direction of travel
* Galvanized folding supports under the chamfer of the load area
* 9 pairs of stake pockets for plug-in stakes, approx. 100 x 50 mm, in the outer frame of the loading platform
* One galvanized steel front wall (EN12642-XL), approx. 1,600 mm high
* Anti-slip sand coating painted onto the central beam
* 1 INOX crosswise tool box under the deck, approx. 1,000 x 400 x 2,500 mm
* 6 pairs of WADER container sockets in the platform, for 1x 20' container, 2x 20' containers or 1x 40' container
* 3 pairs of transverse stake pocket rails mounted in the load area, for plug-in stakes approx. 100 x 50 mm
* Storage for up to 9 pairs of plug-in stakes approx. 100 x 50 mm, bolted inside the front wall
* 2 INOX toolboxes under the platform, left and right, approx. 600 x 350 x 600 mm
* Holder for aluminum ramps, crosswise under the platform, behind the axles
* 1 beacon supplied loose
* 2 pairs of ferry rings under t
该广告为自动翻译,可能存在翻译错误。
您的广告已成功删除
发生错误


















