Wagner Powder painting equipment for sale!
Powder coating device, year 2010 consisting of:
Booth: Prima Cube 16000
Powder supply: Powder Center
Powder recovery: Cyclon Filter 16000
Movement generator: KHG 350
Production process configurations INCLUDING:
I. Presumes
Maximum size of parts: LxWxH=2600x400x1850 mm
II. Equipment
Technological Conveyor automatic speed V=1.2 mtrs/min.
Speed regulation between 0.5-2.5 mtrs/min
1. Pretreatment Stand MNA-3-LPG, total size 16,7 mtrs
Enter size L=2,5 mtrs
a. Washing, degreasing and phosphating; L=3,6 mtrs
-number of spray frames – 10
-number of nozzles in frame – 18
-number of nozzles in total – 180
-delivery of the pump – 162 m3/h
-power of the pump – 15 kW
-vessel 4 m3 for active liquid
-inner heat exchanger with LPG burner – 160 kW
-temperature 500C
-mechanical oil separator
- solution filter
-the dosing system, membrane pump with regulator
-washing time – 3 min
b. Dripping zone L= 3,1 mtrs
-time of dripping – 2 min 30 sec
c. First rinsing; L= 1,2 mtrs
-number of spray frames – 4
-number of nozzles in frame – 18
-number of nozzles in total – 64
-delivery of pump – 38 m3/h
-power of the pump – 3 kW
-vessel 1,5 m3 for water
-first rinsing time – 1 min
c. Dripping zone L= 3,1 mtrs
-time of dripping – 2 min 30 sec
d. Fine rinsing; L= 1,28 mtrs
-number of spray frames – 3
-number of nozzles in frame – 18
-number of nozzles in total – 54
-delivery of pump – 33 m3/h
-vessel 1,5 m3 for water
-power of the pump – 3 kW
-one extra spray frame
-number of nozzles in frame – 18
-fine rinsing time – 1 min
e. Dripping zone L= 2 mtrs
-time of dripping – 1 min 40 sec
Three openings to connect to exhaust system with three ventilators
Cedpfx Aeww Adtohvjpw
Operating space made of stainless steel.
Pipes made of PVC or S/S.
1 unit
2. Automatic Dryer after water AST-1-KLPG:
- operating space dimensions LxWxH=7000x3000x2800
- air curtains each side to avoid heat losses
- one indirect heat exchanger heated with liquid petrol gas to produce 200 kW of rated power
- three blowers 6000 m3/h of air delivery
- two openings to connect to exhaust system
- temperature sensor and temperature regulator
- overheating sensor
- circulation sensor
- operating space made of zinc plated steel
- thermal insulation 200 mm thick
- drying time 10 min
1 unit
3. Automatic Curing Oven APT-2-KLPG for curing powder paints
- operating space dimensions LxWxH=10200x3600x2800
- air curtains on one side to avoid heat losses
- two indirect heat exchangers heated with liquid petrol gas to produce 300 kW of rated power, of each
- eight circulation blowers, capacity of each 6 000 m3/h
- two openings to connect to exhaust system
- temperature sensor and temperature regulator
- overheating sensor
- circulation sensor
- operating space made of zinc plated steel
- thermal insulation 200 mm thick
- curing time 25 min
1 unit
4. An overhead rail conveying system ATR-ADAX, for the paint shop including the following:
• straight track with hangers L=400 mm 146 mtrs
• drive station 2 pc
• tension station 1 pc
• chain lubrication station 1 pc
• drawing of the track supporting structure 1 set
Powder coating device, year 2010 consisting of:
Booth: Prima Cube 16000
Powder supply: Powder Center
Powder recovery: Cyclon Filter 16000
Movement generator: KHG 350
Production process configurations INCLUDING:
I. Presumes
Maximum size of parts: LxWxH=2600x400x1850 mm
II. Equipment
Technological Conveyor automatic speed V=1.2 mtrs/min.
Speed regulation between 0.5-2.5 mtrs/min
1. Pretreatment Stand MNA-3-LPG, total size 16,7 mtrs
Enter size L=2,5 mtrs
a. Washing, degreasing and phosphating; L=3,6 mtrs
-number of spray frames – 10
-number of nozzles in frame – 18
-number of nozzles in total – 180
-delivery of the pump – 162 m3/h
-power of the pump – 15 kW
-vessel 4 m3 for active liquid
-inner heat exchanger with LPG burner – 160 kW
-temperature 500C
-mechanical oil separator
- solution filter
-the dosing system, membrane pump with regulator
-washing time – 3 min
b. Dripping zone L= 3,1 mtrs
-time of dripping – 2 min 30 sec
c. First rinsing; L= 1,2 mtrs
-number of spray frames – 4
-number of nozzles in frame – 18
-number of nozzles in total – 64
-delivery of pump – 38 m3/h
-power of the pump – 3 kW
-vessel 1,5 m3 for water
-first rinsing time – 1 min
c. Dripping zone L= 3,1 mtrs
-time of dripping – 2 min 30 sec
d. Fine rinsing; L= 1,28 mtrs
-number of spray frames – 3
-number of nozzles in frame – 18
-number of nozzles in total – 54
-delivery of pump – 33 m3/h
-vessel 1,5 m3 for water
-power of the pump – 3 kW
-one extra spray frame
-number of nozzles in frame – 18
-fine rinsing time – 1 min
e. Dripping zone L= 2 mtrs
-time of dripping – 1 min 40 sec
Three openings to connect to exhaust system with three ventilators
Cedpfx Aeww Adtohvjpw
Operating space made of stainless steel.
Pipes made of PVC or S/S.
1 unit
2. Automatic Dryer after water AST-1-KLPG:
- operating space dimensions LxWxH=7000x3000x2800
- air curtains each side to avoid heat losses
- one indirect heat exchanger heated with liquid petrol gas to produce 200 kW of rated power
- three blowers 6000 m3/h of air delivery
- two openings to connect to exhaust system
- temperature sensor and temperature regulator
- overheating sensor
- circulation sensor
- operating space made of zinc plated steel
- thermal insulation 200 mm thick
- drying time 10 min
1 unit
3. Automatic Curing Oven APT-2-KLPG for curing powder paints
- operating space dimensions LxWxH=10200x3600x2800
- air curtains on one side to avoid heat losses
- two indirect heat exchangers heated with liquid petrol gas to produce 300 kW of rated power, of each
- eight circulation blowers, capacity of each 6 000 m3/h
- two openings to connect to exhaust system
- temperature sensor and temperature regulator
- overheating sensor
- circulation sensor
- operating space made of zinc plated steel
- thermal insulation 200 mm thick
- curing time 25 min
1 unit
4. An overhead rail conveying system ATR-ADAX, for the paint shop including the following:
• straight track with hangers L=400 mm 146 mtrs
• drive station 2 pc
• tension station 1 pc
• chain lubrication station 1 pc
• drawing of the track supporting structure 1 set
这些广告您可能也感兴趣。
小广告
波兰
8,730 km
卧式车床
WAGNERFCL 3280
WAGNERFCL 3280
小广告
Tatabánya
8,977 km
钢丝绳电动葫芦、电动葫芦、30 吨起重机
KonecranesCXT 600 30 t (2622)
KonecranesCXT 600 30 t (2622)
小广告
德国
9,568 km
WAGNER WDE 800x2000
WAGNERWDE 800x2000
WAGNERWDE 800x2000
小广告
波兰
8,730 km
卧式车床
WAGNERWDE 500 PLUS
WAGNERWDE 500 PLUS
小广告
Morbach
9,583 km
滚筒台
H.I.TRollenbahn
H.I.TRollenbahn
小广告
波兰
8,730 km
立式加工中心
WAGNERVMC 1400
WAGNERVMC 1400
小广告
Wymysłów
8,775 km
万能铣床 WAGNER FCA 500 + 三轴数显(DRO)
Frezarka uniwersalna WAGNER FCA 500 + odczyt cyfrowy 3 osie (DRO)Frezarka uniwersalna WAGNER FCA 500 + odczyt cyfrowy 3 osie (DRO)
Frezarka uniwersalna WAGNER FCA 500 + odczyt cyfrowy 3 osie (DRO)Frezarka uniwersalna WAGNER FCA 500 + odczyt cyfrowy 3 osie (DRO)
小广告
Grebenau
9,387 km
排水卷盘
WAFIOSAHP 2
WAFIOSAHP 2
小广告
Dieburg
9,473 km
车床
WAGNER530X1500
WAGNER530X1500
小广告
Malakoff
9,934 km
车床(普通车床)
WagnerWDC 560 X 2000
WagnerWDC 560 X 2000
小广告
Taufkirchen an der Pram
9,262 km
大袋子灌装系统
Daxner
Daxner
小广告
Dubowo Drugie
8,407 km
涂装完成系统
Wagner
Wagner
小广告
Trittau
9,170 km
外圆磨床-外
YAM/WAGNERGU 27-60
YAM/WAGNERGU 27-60
小广告
Deskle
9,380 km
喷砂机
TOSCATS-500
TOSCATS-500
小广告
Bitburg
9,610 km
喷漆器
WagnerCobra 40 - 10 - sofort verfügbar Top
WagnerCobra 40 - 10 - sofort verfügbar Top
您的广告已成功删除
发生错误