低平板挂车SCHWARZMÜLLER
Tieflader mit gekröpftem Plateau
低平板挂车
SCHWARZMÜLLER
Tieflader mit gekröpftem Plateau
狀況
全新
位置
Essen 

顯示圖片
显示地图
机器数据
价格和位置
- 卖方所在地:
- Heegstraße 6-8, 45356 Essen, 德国

撥打
技术细节
- 最大载重重量:
- 23,800 千克
- 总重量:
- 30,000 千克
- 车轴配置:
- 3 轴
- 总宽度:
- 2,550 毫米
- 设备:
- 防抱死制动系统 (ABS)
优惠详情
- 產品ID:
- A19520596
- 參考編號:
- 36246
- 最後更新:
- 於 15.11.2025
描述
You can find our complete vehicle inventory with immediately and short-term available units on our website.
Selection of equipment features. Full equipment specification available on request.
Weights:
* Permissible gross weight: 24 t
* Technical gross weight: 30 t
Dcsdpfxewx Dcyo Aftor
Dimensions:
* Approx. 2,100 mm = raised front platform incl. gooseneck, corners beveled
* Approx. 5,350 mm = low-bed deck – level loading area
* Approx. 850 mm = rear ramp slope
* Overall width approx. 2,550 mm (or up to approx. 3,000 mm with extensions)
* Loaded loading height approx. 870 mm
* When assembling a combination, please observe the legally permitted overall height and total length.
Frame:
* Steel welded construction with front gooseneck and rear bevel
* Rear ramp slope with central excavator shovel recess = rear recess between longitudinal beams, approx. 2,300 mm long
* Integrated in the outer frame: 5 pairs of approx. 4 t lashing points (4x in the low-bed, 1x on the raised platform)
* 7 pairs of recessed, pull-out 10 t lashing rings (4x in the low-bed, 1x on the ramp slope, 2x on the raised platform)
* Standard ball bearing turntable
Frame Attachments:
* Both sides of the low-bed deck with extendable width extensions with approx. 50 mm softwood planks (track width of construction machinery to be transported must not exceed the outer frame width of approx. 2,550 mm)
* 4 pairs of folding approx. 10 t lashing rings, distribution: 1 pair at the front on the raised platform, between the longitudinal beams; 1 pair at the very rear in the excavator shovel recess, left and right; 1 pair at the front of the raised platform before the gooseneck, between the longitudinal beams; 1 pair in the rear low-bed ahead of the ramp slope, in the shovel recess left + right
Towing Device:
* Fixed drawbar with swivel towing eye approx. 40 + 50 mm, cranked version, silent bush mounting, drawbar retaining spring with tensioner
* Truck coupling height approx. 830 mm to approx. 1,030 mm
* Drawbar length approx. 1,800 mm
Support Device:
* 2 automatic folding supports at the rear
Axles:
* 3 SAF air suspension low-loader axles with drum brakes
* Load capacity: 11 t per axle
* S-cam drum brakes approx. 300/200 mm
* Automatic brake slack adjusters
Wheels:
* 12 tires 235/75 R 17.5, 141J, brand per factory selection
* 12 steel rims 6.75 x 17.5, with preset offset, silver
Brake System/Suspension:
* Dual-line compressed air brake system according to ECE directive R13
* Brake system by Wabco
* EBS system 4S3M, 1st and 2nd axles with sensors
* RSS/RSP – stability control
* Spring-actuated parking brake on 2nd and 3rd axles
* Steel air tank
* Brake/air supply lines with two single coupling heads, yellow/red
* EBS/ABS connection cable
* Retainer rubber for EBS and electrical connectors
* Air suspension with lift and lowering device (rear axles only), automatic ride height adjustment from 15 km/h (RTR), front axle mechanical stop
Floor:
* Approx. 50 mm impregnated softwood flooring, protruding approx. 5–10 mm above upper edge of frame, steel checker plate cover over the wheels
Ramps:
* 2 foldable single-piece lightweight steel drive-on ramps, approx. 2,800 mm long, approx. 750 mm wide, with impregnated hardwood inserts approx. 35 mm
* Ramp spacing adjustable from approx. 350 mm up to max. total width of approx. 3,000 mm
* Ramps lockable in driving position by chains with tensioners
* Ramp lifting aid with spiral spring
* Ramps laterally adjustable manually with bar
* Square ribs welded on the
廣告是自動翻譯的,翻譯中可能會出現一些錯誤。
Selection of equipment features. Full equipment specification available on request.
Weights:
* Permissible gross weight: 24 t
* Technical gross weight: 30 t
Dcsdpfxewx Dcyo Aftor
Dimensions:
* Approx. 2,100 mm = raised front platform incl. gooseneck, corners beveled
* Approx. 5,350 mm = low-bed deck – level loading area
* Approx. 850 mm = rear ramp slope
* Overall width approx. 2,550 mm (or up to approx. 3,000 mm with extensions)
* Loaded loading height approx. 870 mm
* When assembling a combination, please observe the legally permitted overall height and total length.
Frame:
* Steel welded construction with front gooseneck and rear bevel
* Rear ramp slope with central excavator shovel recess = rear recess between longitudinal beams, approx. 2,300 mm long
* Integrated in the outer frame: 5 pairs of approx. 4 t lashing points (4x in the low-bed, 1x on the raised platform)
* 7 pairs of recessed, pull-out 10 t lashing rings (4x in the low-bed, 1x on the ramp slope, 2x on the raised platform)
* Standard ball bearing turntable
Frame Attachments:
* Both sides of the low-bed deck with extendable width extensions with approx. 50 mm softwood planks (track width of construction machinery to be transported must not exceed the outer frame width of approx. 2,550 mm)
* 4 pairs of folding approx. 10 t lashing rings, distribution: 1 pair at the front on the raised platform, between the longitudinal beams; 1 pair at the very rear in the excavator shovel recess, left and right; 1 pair at the front of the raised platform before the gooseneck, between the longitudinal beams; 1 pair in the rear low-bed ahead of the ramp slope, in the shovel recess left + right
Towing Device:
* Fixed drawbar with swivel towing eye approx. 40 + 50 mm, cranked version, silent bush mounting, drawbar retaining spring with tensioner
* Truck coupling height approx. 830 mm to approx. 1,030 mm
* Drawbar length approx. 1,800 mm
Support Device:
* 2 automatic folding supports at the rear
Axles:
* 3 SAF air suspension low-loader axles with drum brakes
* Load capacity: 11 t per axle
* S-cam drum brakes approx. 300/200 mm
* Automatic brake slack adjusters
Wheels:
* 12 tires 235/75 R 17.5, 141J, brand per factory selection
* 12 steel rims 6.75 x 17.5, with preset offset, silver
Brake System/Suspension:
* Dual-line compressed air brake system according to ECE directive R13
* Brake system by Wabco
* EBS system 4S3M, 1st and 2nd axles with sensors
* RSS/RSP – stability control
* Spring-actuated parking brake on 2nd and 3rd axles
* Steel air tank
* Brake/air supply lines with two single coupling heads, yellow/red
* EBS/ABS connection cable
* Retainer rubber for EBS and electrical connectors
* Air suspension with lift and lowering device (rear axles only), automatic ride height adjustment from 15 km/h (RTR), front axle mechanical stop
Floor:
* Approx. 50 mm impregnated softwood flooring, protruding approx. 5–10 mm above upper edge of frame, steel checker plate cover over the wheels
Ramps:
* 2 foldable single-piece lightweight steel drive-on ramps, approx. 2,800 mm long, approx. 750 mm wide, with impregnated hardwood inserts approx. 35 mm
* Ramp spacing adjustable from approx. 350 mm up to max. total width of approx. 3,000 mm
* Ramps lockable in driving position by chains with tensioners
* Ramp lifting aid with spiral spring
* Ramps laterally adjustable manually with bar
* Square ribs welded on the
廣告是自動翻譯的,翻譯中可能會出現一些錯誤。
这些广告您可能也感兴趣。
小广告
Aizkraukle
8,173 km
自动生产电线杆/木桩
OSWALD
OSWALD
小广告
Grevesmühlen
9,111 km
带根部减速器的剥皮机
Baljer & Zembrod
Baljer & Zembrod
小广告
Nevers
10,004 km
WEINMANN
WEINMANN
WEINMANN
小广告
德国
9,303 km
塔式起重机
LiebherrLI-24
LiebherrLI-24
小广告
Velen
9,470 km
重型拖车
WMTD30/7,0 x 2,5
WMTD30/7,0 x 2,5
小广告
Gerolzhofen
9,381 km
推台锯
ALTENDORFF45
ALTENDORFF45
小广告
Niederlangen
9,390 km
重型拖车
AWIPAAV 10t 6000x2000mm
AWIPAAV 10t 6000x2000mm
小广告
Rīga
8,225 km
圆角机 80-200 毫米
OSWALDRM 200
OSWALDRM 200
您的广告已成功删除
发生错误


















































































