涂装车间
Pony Luxury Coating Pony L11000 (11x5x5)

製造年份
2025
狀況
全新
位置
Würzburg 德国
涂装车间 Pony Luxury Coating Pony L11000 (11x5x5)
涂装车间 Pony Luxury Coating Pony L11000 (11x5x5)
涂装车间 Pony Luxury Coating Pony L11000 (11x5x5)
涂装车间 Pony Luxury Coating Pony L11000 (11x5x5)
涂装车间 Pony Luxury Coating Pony L11000 (11x5x5)
涂装车间 Pony Luxury Coating Pony L11000 (11x5x5)
涂装车间 Pony Luxury Coating Pony L11000 (11x5x5)
more Images
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
顯示圖片
显示地图

机器数据

機器描述:
涂装车间
製造商:
Pony Luxury Coating
模型:
Pony L11000 (11x5x5)
製造年份:
2025
狀況:
新的
功能性:
完全功能

价格和位置

位置:
Schulstr 3, 97084 Würzburg, DE 德国
撥打

技术细节

总高度:
5,600 毫米
总长度:
11,200 毫米
总宽度:
5,100 毫米
输入电流类型:
三相
保修期限:
24 个月
内部高度:
4,970 毫米
内部长度:
11,000 毫米
温度:
80 °C
内宽:
5,000 毫米
空氣需求:
52,000 立方米/小时
输入电压:
380 V
加热能力:
250 千瓦 (339.91 马力)
功率:
45 千瓦 (61.18 马力)
燃料:
液化石油气(LPG)
能耗:
45 千瓦时
频率:
50 赫兹
绝缘厚度:
50 毫米
额定功率:
250 千瓦 (339.91 马力)
钢板厚度(最大):
2 毫米
设备:
照明

优惠详情

產品ID:
A19572531
最後更新:
於 07.10.2025

描述

* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.

* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:

* PAINTING PROCESS:
Crjdpfx Aajwzl Hxe Njh
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.

* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.

* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.

* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.

ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.

廣告是自動翻譯的,翻譯中可能會出現一些錯誤。

文件

19572531-01.pdf (PDF)

供應商

註冊時間: 2025

10 在线广告

撥打

提交申請

土地us 
德国
奥地利
瑞士
美国
英国
法国
比利时
西班牙
墨西哥
意大利
荷兰
波兰
俄罗斯联邦
白俄罗斯(白俄罗斯共和国)
乌克兰
爱沙尼亚
土耳其
新西兰
爱尔兰
捷克共和国
丹麦
芬兰
瑞典
挪威
卢森堡
希腊
立陶宛
拉脱维亚
冰岛
葡萄牙
巴西
委内瑞拉
阿根廷
匈牙利
斯洛伐克
罗马尼亚
摩尔多瓦
斯洛文尼亚
塞尔维亚
黑山
阿尔巴尼亚
克罗地亚
保加利亚
北马其顿
波斯尼亚和黑塞哥维那
以色列
埃及
摩洛哥
印度
印度尼西亚
韩国
日本
泰国
马来西亚
越南
China
中国台湾
伊朗
孟加拉国
阿富汗
提示: 您的请求将被转发给该机械类别的所有卖家。 这样您可以收到大量的报价。
无法发送请求。请稍后再试。

電話 & 傳真

+49 176 7... 广告