粉末处理设备Malarnia proszkowa Mogielnicki
粉末处理设备
Malarnia proszkowa Mogielnicki
EXW 固定价格 不包含增值稅
€119,000
製造年份
2017
狀況
二手
位置
Dołuje 

顯示圖片
显示地图
机器数据
价格和位置
EXW 固定价格 不包含增值稅
€119,000
- 位置:
- 72-002 Dołuje, Polska

撥打
技术细节
- 设备:
- 驾驶室
优惠详情
- 產品ID:
- A20614390
- 最後更新:
- 於 26.11.2025
描述
For sale: a complete, fully operational Mogielnicki automatic powder coating line.
The equipment was manufactured in 2017 and is in excellent technical condition, having run for only 8,073 hours. The line comes with complete technical documentation and is ready for immediate commissioning.
Equipment details:
- 5-stage spray washer (washing, rinsing, passivation, drying)
– 8 spray gates, 112 nozzles
– pumps: 101 m³/h, power: 9.2 kW
– tank: 3 m³, Riello heating, temperature: 50–60°C
– AISI 304 stainless steel
- Tunnel dryer with automatic temperature control
- Cyclone powder coating booth with platforms
– 4 Gema automatic spray guns
– 2 Gema manual spray guns
– Booth equipped with cyclone and powder paint recovery system, ensuring high process efficiency and reduced material losses
- Powder paint polymerisation oven
- Overhead conveyor system – speed: 1 m/min, max. 50 kg/m
- Dual-stage demineralisation station
Technical parameters:
Nodpfx Adjxzdi Aevswp
- Maximum workpiece size: 1200 × 500 × 1200 mm (in practice, items up to approx. 1900 mm in length can be coated)
- Required floor space: 25.5 × 15 × 5 m
- Conveyor speed: 1 m/min
- Installed power: 99 kW
Media requirements:
- Heating oil: 77 l/h (start-up), 47 l/h (continuous operation)
- Mains water: 200 l/h
- Compressed air: 58 m³/h (6 bar)
Condition:
The line was used in serial production, regularly serviced, and maintained in excellent condition. Fully automatic control – temperature regulators, safety sensors, Riello heating.
廣告是自動翻譯的,翻譯中可能會出現一些錯誤。
The equipment was manufactured in 2017 and is in excellent technical condition, having run for only 8,073 hours. The line comes with complete technical documentation and is ready for immediate commissioning.
Equipment details:
- 5-stage spray washer (washing, rinsing, passivation, drying)
– 8 spray gates, 112 nozzles
– pumps: 101 m³/h, power: 9.2 kW
– tank: 3 m³, Riello heating, temperature: 50–60°C
– AISI 304 stainless steel
- Tunnel dryer with automatic temperature control
- Cyclone powder coating booth with platforms
– 4 Gema automatic spray guns
– 2 Gema manual spray guns
– Booth equipped with cyclone and powder paint recovery system, ensuring high process efficiency and reduced material losses
- Powder paint polymerisation oven
- Overhead conveyor system – speed: 1 m/min, max. 50 kg/m
- Dual-stage demineralisation station
Technical parameters:
Nodpfx Adjxzdi Aevswp
- Maximum workpiece size: 1200 × 500 × 1200 mm (in practice, items up to approx. 1900 mm in length can be coated)
- Required floor space: 25.5 × 15 × 5 m
- Conveyor speed: 1 m/min
- Installed power: 99 kW
Media requirements:
- Heating oil: 77 l/h (start-up), 47 l/h (continuous operation)
- Mains water: 200 l/h
- Compressed air: 58 m³/h (6 bar)
Condition:
The line was used in serial production, regularly serviced, and maintained in excellent condition. Fully automatic control – temperature regulators, safety sensors, Riello heating.
廣告是自動翻譯的,翻譯中可能會出現一些錯誤。
您的广告已成功删除
发生错误
























