洁净室 ISO 8
洁净室 ISO 8
EXW VB 不含增值税
€50,000
出厂年份
2020
状况
二手
(完全功能)
位置
Łódź 

机器数据
价格和位置
EXW VB 不含增值税
€50,000
- 位置:
- Łódź, 波兰

拨打
优惠详情
- 广告编号:
- A14477200
- 更新:
- 最近更新时间为 02.01.2024
描述
CLEANROOM - ISO 8
Ppodpoq H H Ruofx Aifeu
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
该广告为自动翻译,可能存在翻译错误。
Ppodpoq H H Ruofx Aifeu
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
该广告为自动翻译,可能存在翻译错误。
供應商
注意: 免费注册或登录,以获取所有信息。
注册于: 2023
1 在线广告
发送询价
电话 & 传真
+48 728 4... 广告
这些广告您可能也感兴趣。
拍卖
结束于
d
h
min
s
拍卖已结束
Rheinland-Pfalz
9,591 km
立式加工中心
HAASVF-7/40
HAASVF-7/40
小广告
Meiningen
9,337 km
300°C电加热循环热风炉
Ingenieurbüro Klein mit Umluft, NanodacUK 8820-300
Ingenieurbüro Klein mit Umluft, NanodacUK 8820-300
拍卖
结束于
d
h
min
s
拍卖已结束
Rheinland-Pfalz
9,591 km
移动立柱式铣床
ANAYAKHVM 3300
ANAYAKHVM 3300
拍卖
结束于
d
h
min
s
拍卖已结束
Baden-Württemberg
9,510 km
造粒机
GetechaRS 600
GetechaRS 600
小广告
Ahaus
9,452 km
立柱式旋臂起重机
ABUSLS / 4000 MM x 1000 KG
ABUSLS / 4000 MM x 1000 KG
拍卖
结束于
d
h
min
s
拍卖已结束
Grand Est
9,591 km
爆破系统
RöslerRMBD 400/4
RöslerRMBD 400/4
拍卖
结束于
d
h
min
s
拍卖已结束
Baden-Württemberg
9,566 km
立式车床
IndexV 160-G
IndexV 160-G
小广告
德国
9,303 km
对流烤箱
NaberthermN500/65HA
NaberthermN500/65HA
拍卖
结束于
d
h
min
s
拍卖已结束
Castilla-La Mancha
10,916 km
双斜切锯
AlfamacchineTA-350 Auto Saw
AlfamacchineTA-350 Auto Saw
拍卖
结束于
d
h
min
s
拍卖已结束
Castilla-La Mancha
10,916 km
热缩包装机
SmipackHS800 SERVO
SmipackHS800 SERVO
小广告
Hradec Králové
9,022 km
切菜机
Urschel1700
Urschel1700
拍卖
结束于
d
h
min
s
拍卖已结束
Nordrhein-Westfalen
9,523 km
立式加工中心
HermleC800 V
HermleC800 V
拍卖
结束于
d
h
min
s
拍卖已结束
Steiermark
9,233 km
组合式激光与铣削机床
DMGLasertec Shape 65
DMGLasertec Shape 65
小广告
Enschede
9,451 km
管材激光切割机
Bodor K2
Bodor K2
拍卖
结束于
d
h
min
s
拍卖已结束
Steiermark
9,175 km
卧式加工中心
MORI SEIKISH-50
MORI SEIKISH-50
您的广告已成功删除
发生错误































































































































































































