Jungheinrich ERC 214 电动托盘堆高车Jungheinrich
Ameise Jungheinrich ERC 214
Jungheinrich ERC 214 电动托盘堆高车
Jungheinrich
Ameise Jungheinrich ERC 214
VB 不含增值税
€1,100
出厂年份
2006
状况
二手
位置
Sinntal 

显示图片
显示地图
机器数据
价格和位置
VB 不含增值税
€1,100
- 位置:
- Sinntal, 德国

技术细节
- 额定载荷:
- 1,400 千克
- 电池电压:
- 24 V
- 电池重量:
- 274 千克
优惠详情
- 广告编号:
- A21731193
- 更新:
- 最近更新时间为 16.04.2026
描述
Ameise Jungheinrich ERC 214
The pallet truck is currently not operational:
Drive switch defective, new battery required
General terms and conditions for the offer:
- 100% payment in advance, net without deduction, before dismantling begins and upon receipt of invoice.
- The equipment remains our property until full payment has been received.
- The purchaser may withdraw from the purchase agreement at any time in writing and without stating reasons until full payment has been made.
- Ex stock location, the buyer is responsible for organizing dismantling, loading, and transport of the equipment at their own expense.
- The buyer is responsible for proper dismantling and commissioning.
- The buyer undertakes to contract only qualified specialists for dismantling.
- Dates must be coordinated with KT and adapted to the plant’s operating hours.
- Dismantling must be completed entirely up to the supply lines.
Hnodpfx Aaoy Dg N Heaok
- All site safety regulations must be observed.
- The equipment is sold as inspected and in its current condition, without any guarantee or warranty for material or cosmetic defects.
该广告为自动翻译,可能存在翻译错误。
The pallet truck is currently not operational:
Drive switch defective, new battery required
General terms and conditions for the offer:
- 100% payment in advance, net without deduction, before dismantling begins and upon receipt of invoice.
- The equipment remains our property until full payment has been received.
- The purchaser may withdraw from the purchase agreement at any time in writing and without stating reasons until full payment has been made.
- Ex stock location, the buyer is responsible for organizing dismantling, loading, and transport of the equipment at their own expense.
- The buyer is responsible for proper dismantling and commissioning.
- The buyer undertakes to contract only qualified specialists for dismantling.
- Dates must be coordinated with KT and adapted to the plant’s operating hours.
- Dismantling must be completed entirely up to the supply lines.
Hnodpfx Aaoy Dg N Heaok
- All site safety regulations must be observed.
- The equipment is sold as inspected and in its current condition, without any guarantee or warranty for material or cosmetic defects.
该广告为自动翻译,可能存在翻译错误。
供應商
专业卖家
最后在线:昨天
注册于: 2020
16 在线广告
发送询价
您的广告已成功删除
发生错误












