FAL 发动机装配与检测线
FAL

出厂年份
2020
状况
二手
位置
Czechowice-Dziedzice 波兰
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL 发动机装配与检测线 FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL

基本数据

机器名称:
FAL 发动机装配与检测线
制造商:
FAL
出厂年份:
2020
状况:
二手

价格和位置

拍卖开始:
01.11.2026 在 15:55时
拍卖结束:
31.12.2026 在 12:00时

位置:
Czechowice-Dziedzice, Polen 波兰
拨打

优惠详情

广告编号:
A23339912
参考编号:
2970001
更新:
最近更新时间为 16.11.2026

描述

The lot consists of:
(1) FAL Motor Assembly and Testing Line (1)

Technical Details:
FAL Motor Assembly Line 1 – Technical Description
The FAL Motor Assembly Line 1 is a fully integrated production system for the assembly and testing of electric motors, located at the Valeo plant in Poland. The line is designed for high-volume automotive production and combines automated, semi-automated, and manual processes within a continuous material flow layout.

Basic information:
Isdpfx Ahj Akk Rke Ajii
Cycle time: approx. 86 seconds per unit
TRP/OEE: approx. 85%
Total surface area: approx. 855 m²
Process Overview

The line consists of 25 sequential stations covering the complete assembly process from component loading to final packaging and reintegration.

Initial assembly and housing preparation:
OP10: Robot-based component loading
OP20: Shrinking process (heating inner housing and joining stator)
OP30: Cooling tunnel
OP40: Manual assembly of X-ring and D-ring
OP50: Pre-assembly of outer housing

Core assembly and rotor integration:
OP60: Joining inner housing to outer housing
OP70: Rotor magnetization and measurement
OP80: Pre-assembly of A-shield and rotor insertion
OP90: Attaching A-shield to outer housing
OP110: Screwing A-shield

Intermediate assembly and component integration:
OP135: Manual interconnector assembly
OP136FA / OP136PA: Counter ring insertion, cooling cover joining, vent assembly

End-of-line handling and testing:
OP140: Transfer to EOL loop
OP150–190: End-of-line testing
OP230/240: Leak testing (test 1 and test 2)
OP245: Rotation test and EM graver verification
OP260: Laser marking and stamping

Final assembly and packaging:
OP270: Assembly of plugs, transportation cover, and cap
OP280: Final inspection and packaging
OP290: Reintegration process

该广告为自动翻译,可能存在翻译错误。

供應商

上次在线:上周

注册于: 2011

72 在线广告

Trustseal icon

电话 & 传真

+49 8151 ... 广告