机器人装配工作站,计量工作站Epson
G10-854SR
机器人装配工作站,计量工作站
Epson
G10-854SR
起拍價 不包含增值稅
€7,140
狀況
二手
位置
Borken 

顯示圖片
显示地图
机器数据
价格和位置
起拍價 不包含增值稅
€7,140
- 位置:
- Dunkerstrasse 29, 46325 Borken/Burlo, Deutschland

撥打
优惠详情
- 產品ID:
- A7393211
- 參考編號:
- 25070
- 最後更新:
- 於 07.08.2025
描述
Epson G10-854SR Robot Assembly Station Dispensing Station
The assembly station is divided into the following sub-stations: 3.1 Dispensing Area, 3.2 Assembly Area KK+SW, and 3.3 Assembly Area Front. (KK = heatsink, SW = front wall bracket)
St.3.1: Dispensing Area
- A workpiece carrier (WT) with mounted chassis and circuit boards is conveyed via the transfer belt into the dispensing area.
- The WT is stopped at the lift-positioning unit (HuPo), raised off the belt, and secured in place
- The X-Y-Z handling system moves the dispensing head to the designated position and initiates the dispensing process.
- Once dosing is completed successfully, the handling system moves to the home position and the WT is placed back onto the conveyor
- Transfer continues into the assembly area KK+SW (prerequisite: no WT in placement position)
St.3.2: Assembly Area KK+SW
- A WT transported from the dispensing area enters the KK+SW assembly area via the transfer belt.
- It is stopped at the lift-positioning unit (HuPo), raised from the conveyor, and fixed in place; during this, the chassis side panels of the partially assembled component are aligned
- Simultaneously, the positioning of the KK and SW tray is carried out
- Both a KK tray stack (12) and a SW tray stack (12) are manually placed onto each respective infeed conveyor outside of the safety enclosure
- The two safety shutters are opened and the loaded tray stacks are conveyed into the gripping position of their respective stackers
- The safety shutters are then closed
- The respective grippers pick up the corresponding tray
- Using the Z-axis, trays are singled and transported upwards (above the actual pick-up height)
- To center and stabilize the trays, a centering support is positioned beneath each tray using the X-handling system.
- Using the stacker Z-axis, each tray is placed onto its centering support
- The trays are now ready for component pick-up
- The SCARA robot with a multi-gripper picks up the KK from the tray and places it in an intermediate alignment position (to compensate for inaccuracies in the pick-up and establish a fixed gripping point for assembly)
- The KK is scanned, picked up again, and if the scanner result is OK, installed onto the WT
- Non-OK KKs are placed in a non-OK container
- The multi-gripper on the SCARA robot then picks up the SW from the tray and places it in the alignment position
- The SW is picked up again and installed onto the WT
- Continue with Assembly Area Front
Technical Data
Design: SCARA (4-axis robot)
Payload: nominal 5 kg, maximum 10 kg
Horizontal reach: 850 mm
Vertical reach: Axis 3: 420 mm
Rotational range: J4: +/- 360°
Horizontal repeatability: +/- 0.025 mm
Vertical repeatability: J3: +/- 0.01 mm
Rotational repeatability: J4: +/- 0.005°
Maximum work envelope: Axis 1: +/- 152°, Axis 2: +/- 152.5°, Axis 3: 420 mm, Axis 4: +/- 360°
Maximum operating speed: J1,J2: +/- 11,000 mm/s, J3: +/- 2,350 mm/s, J4: +/- 2,400°/s
Permissible inertia: nominal 0.02 kg*m², maximum 0.25 kg*m²
User cabling, electrical: 1x D-Sub 9 pin, 1x D-Sub 15 pin
Iodpfxsibx S Nj Afuoal
Z-axis: Outer diameter: 25 mm
Press-in force: 250 N
Weight: 48 kg
Control: EPSON RC180
Mounting type: Ceiling
IP protection class: IP20
Power and signal cables: 3 m
Additional assembly modules in other sizes – new and used – can be found in our shop!
International shipping costs on request.
廣告是自動翻譯的,翻譯中可能會出現一些錯誤。
The assembly station is divided into the following sub-stations: 3.1 Dispensing Area, 3.2 Assembly Area KK+SW, and 3.3 Assembly Area Front. (KK = heatsink, SW = front wall bracket)
St.3.1: Dispensing Area
- A workpiece carrier (WT) with mounted chassis and circuit boards is conveyed via the transfer belt into the dispensing area.
- The WT is stopped at the lift-positioning unit (HuPo), raised off the belt, and secured in place
- The X-Y-Z handling system moves the dispensing head to the designated position and initiates the dispensing process.
- Once dosing is completed successfully, the handling system moves to the home position and the WT is placed back onto the conveyor
- Transfer continues into the assembly area KK+SW (prerequisite: no WT in placement position)
St.3.2: Assembly Area KK+SW
- A WT transported from the dispensing area enters the KK+SW assembly area via the transfer belt.
- It is stopped at the lift-positioning unit (HuPo), raised from the conveyor, and fixed in place; during this, the chassis side panels of the partially assembled component are aligned
- Simultaneously, the positioning of the KK and SW tray is carried out
- Both a KK tray stack (12) and a SW tray stack (12) are manually placed onto each respective infeed conveyor outside of the safety enclosure
- The two safety shutters are opened and the loaded tray stacks are conveyed into the gripping position of their respective stackers
- The safety shutters are then closed
- The respective grippers pick up the corresponding tray
- Using the Z-axis, trays are singled and transported upwards (above the actual pick-up height)
- To center and stabilize the trays, a centering support is positioned beneath each tray using the X-handling system.
- Using the stacker Z-axis, each tray is placed onto its centering support
- The trays are now ready for component pick-up
- The SCARA robot with a multi-gripper picks up the KK from the tray and places it in an intermediate alignment position (to compensate for inaccuracies in the pick-up and establish a fixed gripping point for assembly)
- The KK is scanned, picked up again, and if the scanner result is OK, installed onto the WT
- Non-OK KKs are placed in a non-OK container
- The multi-gripper on the SCARA robot then picks up the SW from the tray and places it in the alignment position
- The SW is picked up again and installed onto the WT
- Continue with Assembly Area Front
Technical Data
Design: SCARA (4-axis robot)
Payload: nominal 5 kg, maximum 10 kg
Horizontal reach: 850 mm
Vertical reach: Axis 3: 420 mm
Rotational range: J4: +/- 360°
Horizontal repeatability: +/- 0.025 mm
Vertical repeatability: J3: +/- 0.01 mm
Rotational repeatability: J4: +/- 0.005°
Maximum work envelope: Axis 1: +/- 152°, Axis 2: +/- 152.5°, Axis 3: 420 mm, Axis 4: +/- 360°
Maximum operating speed: J1,J2: +/- 11,000 mm/s, J3: +/- 2,350 mm/s, J4: +/- 2,400°/s
Permissible inertia: nominal 0.02 kg*m², maximum 0.25 kg*m²
User cabling, electrical: 1x D-Sub 9 pin, 1x D-Sub 15 pin
Iodpfxsibx S Nj Afuoal
Z-axis: Outer diameter: 25 mm
Press-in force: 250 N
Weight: 48 kg
Control: EPSON RC180
Mounting type: Ceiling
IP protection class: IP20
Power and signal cables: 3 m
Additional assembly modules in other sizes – new and used – can be found in our shop!
International shipping costs on request.
廣告是自動翻譯的,翻譯中可能會出現一些錯誤。
这些广告您可能也感兴趣。
小广告
Altena
9,464 km
用于厢式压滤机的过滤布
Filtertücher für FilterpressenKurzfristig verfügbar
Filtertücher für FilterpressenKurzfristig verfügbar
小广告
Burgas
8,542 km
工业机器人
KUKAKR200-3 COMP + SPINDLE +TOOL CHANGER SET
KUKAKR200-3 COMP + SPINDLE +TOOL CHANGER SET
小广告
Ennepetal
9,482 km
带焊接机器人的完整焊接单元
KUKA + Dalex + HSKR 150 R2700 extra +
KUKA + Dalex + HSKR 150 R2700 extra +
小广告
Berlin
9,060 km
工业机器人
KukaKR 90
KukaKR 90
小广告
Dinkelscherben
9,455 km
传送带 注塑L 传送带
die magnetprofis2022120610
die magnetprofis2022120610
小广告
Gers
10,396 km
光纤激光切割机
Bodor P3 20KW
Bodor P3 20KW
小广告
Coevorden
9,434 km
带 2 个托盘的激光切割机 6 Kw
OREEOR-PH 3015 STOCK ( 6 KW )
OREEOR-PH 3015 STOCK ( 6 KW )
小广告
德国
9,303 km
全防护激光切割机
BodorP Series 22KW
BodorP Series 22KW
小广告
Roreto
9,848 km
双面供料站
MAHROS (SCM Group)BRUSH / D - C
MAHROS (SCM Group)BRUSH / D - C
小广告
Milan
9,710 km
经济型光纤激光切割机
Bodor C
Bodor C
您的广告已成功删除
发生错误

























































































