蒸汽轮机1. Brněnská strojírna
Turbogenerator set 25MW
蒸汽轮机
1. Brněnská strojírna
Turbogenerator set 25MW
EXW 起拍價 不包含增值稅
€680,000
製造年份
1985
狀況
二手
位置
捷克共和国 

顯示圖片
显示地图
机器数据
价格和位置
EXW 起拍價 不包含增值稅
€680,000
- 位置:
- 689/117, Vratimovská, 719 00 Slezská Ostrava
撥打
技术细节
- 压力:
- 90 横杆
- 功率:
- 25 千瓦 (33.99 马力)
- 输入频率:
- 50 赫兹
- 输入电流类型:
- 空调
- 温度:
- 515 °C
- 总重量:
- 45,000 千克
- 总高度:
- 5,000 毫米
- 最大转速:
- 3,000 转/分
- 冷却类型:
- 水
优惠详情
- 產品ID:
- A19313346
- 參考編號:
- TG1
- 最後更新:
- 於 06.06.2025
描述
1. Brněnská strojírna, Turbogenerator set, back pressure steam turbine 25MW
Manufacturer: 1. Brněnská strojírna
Power: 25 000 kW
Type: R25-9/1,9
RPM: 3000 / min
Steam pressure: 90 bar
Output steam pressure: 18 bar
Gedewqp Acspfx Af Aokc
Steam temperature: 515 ºC
The equipment is from year 1985 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3 000 x 3 000 x 5 100 mm
Weight: 45 000 kg
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Maintenece:
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. The O&M was carried out by the turbine manufacturer or a specialist company in the field.
The last O&M was carried out in 2007 for a total amount of 44.2 million EUR. The following repairs were carried out:
- repair of the rotor with new blading
- repair of the stator flow section with new blading
- Replacement of quick-action and control valve blocks
- replacement of the control gear on the machine,
- reconstruction of the control system
- repair of oil. system,
- revision of steam system, valves, drainage
The last repair (SO) was carried out in 2020 for a total amount of 16.2 million CZK. The following repairs were carried out:
- revision of the flow section of the turbine, cleaning, replacement of seals, rotor balancing
- oil revision and cleaning. Revision of the rotor, cleaning of the rotor, revision of the rotor system, installation of full flow filtration
- complete repair of the KUP with repiping,
- revision and repair of the turbine control and the control safety system
- inspection of steam pipelines and valves
Regular maintenance and servicing was carried out during operation, with further periodic repairs planned for 2027.
Manufacturer: 1. Brněnská strojírna
Power: 25 000 kW
Type: R25-9/1,9
RPM: 3000 / min
Steam pressure: 90 bar
Output steam pressure: 18 bar
Gedewqp Acspfx Af Aokc
Steam temperature: 515 ºC
The equipment is from year 1985 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3 000 x 3 000 x 5 100 mm
Weight: 45 000 kg
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Maintenece:
The machine has been regularly maintained and serviced since its commissioning. GO and SO have been carried out at intervals of about 5 years according to the actual condition. The O&M was carried out by the turbine manufacturer or a specialist company in the field.
The last O&M was carried out in 2007 for a total amount of 44.2 million EUR. The following repairs were carried out:
- repair of the rotor with new blading
- repair of the stator flow section with new blading
- Replacement of quick-action and control valve blocks
- replacement of the control gear on the machine,
- reconstruction of the control system
- repair of oil. system,
- revision of steam system, valves, drainage
The last repair (SO) was carried out in 2020 for a total amount of 16.2 million CZK. The following repairs were carried out:
- revision of the flow section of the turbine, cleaning, replacement of seals, rotor balancing
- oil revision and cleaning. Revision of the rotor, cleaning of the rotor, revision of the rotor system, installation of full flow filtration
- complete repair of the KUP with repiping,
- revision and repair of the turbine control and the control safety system
- inspection of steam pipelines and valves
Regular maintenance and servicing was carried out during operation, with further periodic repairs planned for 2027.
这些广告您可能也感兴趣。
小广告

8,881 km
蒸汽轮机
1. Brněnská strojírnaTurbogenerator set 25MW
1. Brněnská strojírnaTurbogenerator set 25MW
小广告

8,881 km
蒸汽轮机
1. Brněnská strojírnaTurbogenerator set 25MW
1. Brněnská strojírnaTurbogenerator set 25MW
您的广告已成功删除
发生错误