蒸汽轮机ČKD
Turbogenerator set 17,5MW
蒸汽轮机
ČKD
Turbogenerator set 17,5MW
EXW 起拍價 不包含增值稅
€220,000
製造年份
1958
狀況
二手
位置
捷克共和国 

顯示圖片
显示地图
机器数据
价格和位置
EXW 起拍價 不包含增值稅
€220,000
- 位置:
- 117, Vratimovská 689, 719 00 Slezská Ostrava, Czechia
撥打
技术细节
- 功率:
- 17,500 千瓦 (23,793.35 马力)
- 输入频率:
- 50 赫兹
- 温度:
- 320 °C
- 总重量:
- 30,000 千克
- 最大转速:
- 3,000 转/分
- 总长度:
- 7,000 毫米
优惠详情
- 產品ID:
- A19313691
- 參考編號:
- TG4
- 最後更新:
- 於 06.06.2025
描述
ČKD, Turbogenerator set, condensate steam turbine 17,5MW
Manufacturer: ČKD
Power: 17 500 kW
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Output steam pressure: 18 bar
Steam temperature: 320 ºC
The equipment is from year 1958 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3500 x 3500x7000mm,
Weight:
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Iedpfxswqqa Ns Af Aetn
The machine has been regularly maintained and serviced since its commissioning. The period of GO and SO was carried out according to the actual condition. The repairs were carried out by the turbine manufacturer, the reconstruction (1969) and subsequent repairs were carried out by the 1st Brno Engineering Works. GO with replacement of blades was carried out in 1986 and SO in 2005 with standard scope of work. In the last period, routine maintenance and repairs were carried out by the local maintenance of the heating plant, when the following repairs were mainly carried out:
- control maintenance, oil. system, condensation
- maintenance of the heat exchanger station
- maintenance of valves
Manufacturer: ČKD
Power: 17 500 kW
Type:
RPM: 3000/ min
Steam pressure: 19 bar
Output steam pressure: 18 bar
Steam temperature: 320 ºC
The equipment is from year 1958 and has received all maintenance required for the maximum reliability, availability and capacity.
Size: 3500 x 3500x7000mm,
Weight:
Generator, gearbox, oil system and all related electro and InC equipment included.
We will send all technical data on request.
Iedpfxswqqa Ns Af Aetn
The machine has been regularly maintained and serviced since its commissioning. The period of GO and SO was carried out according to the actual condition. The repairs were carried out by the turbine manufacturer, the reconstruction (1969) and subsequent repairs were carried out by the 1st Brno Engineering Works. GO with replacement of blades was carried out in 1986 and SO in 2005 with standard scope of work. In the last period, routine maintenance and repairs were carried out by the local maintenance of the heating plant, when the following repairs were mainly carried out:
- control maintenance, oil. system, condensation
- maintenance of the heat exchanger station
- maintenance of valves
您的广告已成功删除
发生错误